A recent residential installation was performed in the St. George Island Plantation community, in an effort to control stormwater flow that was pooling and damaging the resident’s lawn and the road alongside it. This water is now retained within the garden for 48 hours (time of maximum contaminant removal efficiency) and can then be released as natural flow or pumped out for reuse. Erosion, damage to existing landscaping, and the introduction of contaminants into the groundwater, gulf and bay are now avoided using our active eco-WEIR™ technology.